Pulse x reMKTR

Migrate Amazon Fulfillment Inbound API Fast, Without Disruption

Written by Jacob Heinz | Nov 4, 2025 6:29:18 PM

Your inbound shipments don’t care about your API version. They care about boxes moving. That’s why this upgrade—moving from Fulfillment Inbound API v0 to v2024-03-20—can’t trip your ops.

Here’s the good news: Amazon ships clear migration guidance with detailed use cases, so you can adapt workflows fast and skip the chaos. The better news: if you treat this like a real cloud migration (not a blind code swap), you’ll cut risk, preserve throughput, and set yourself up for future versions.

You’ll walk away with a battle-tested plan: how to stage the rollout, validate parity, monitor everything, and retire v0 cleanly. We’ll borrow best practices from AWS playbooks (think aws migration hub discipline, canary releases, and automated tests)—and plug them straight into your SP-API move.

If your goal is zero downtime and fewer 2 a.m. pages, keep reading.

One promise before we dive in: this is practical. We’re talking concrete steps, edge cases to watch, and checklists your team can run this week. The aim isn’t fancy architecture diagrams—it’s keeping cartons moving, labels printing, and FCs happy while you switch to Fulfillment Inbound API v2024-03-20.

TL;DR

  • Treat the Fulfillment Inbound API upgrade like a cloud migration: plan, parallelize, validate, then cut over.
  • Run v0 and v2024-03-20 side-by-side; use feature flags and canary traffic to catch issues.
  • Automate contract tests and data parity checks; monitor with clear rollbacks.
  • Borrow AWS discipline: aws migration hub mindset, incremental waves, and checklists.
  • Watch adjacent tooling: microsoft monitoring agent end of life means migrate to Azure Monitor Agent.

What’s Changing

Version shift plan

You’re moving from Fulfillment Inbound API v0 to v2024-03-20. Amazon provides migration guidance with detailed use-case maps so you can adapt existing flows and leverage new features without disruption. Translation: you can keep shipments moving while you switch your integration under the hood.

Plan like this is a new application with familiar goals. Read the docs like a lawyer: note required fields, enum changes, pagination behavior, error models, and any new validation rules. If your integration uses specific endpoints heavily (creating shipment plans, confirming shipments, generating labels), flag those early and assign owners. Also, confirm authentication scopes and roles—ensure your LWA app and IAM role policies cover every call you’ll need in v2024-03-20 so you don’t discover scope gaps mid-cutover.

The impact on your workflows

Expect name changes, request/response tweaks, and stricter validation in places. Don’t assume a 1:1 payload map. The safest path is to treat this as a new integration: write a separate client, add translators for legacy models, and create a compatibility layer so downstream systems don’t panic.

In practice, changes ripple into:

  • Label generation: field names or formats may shift, which can break label printers if you rely on brittle mappings.
  • Cartonization details: if carton data is calculated or returned differently, your WMS might need a translation step.
  • Error surfaces: clearer errors are great, but only if your code handles them. Parse and categorize errors early so retries and alerts behave.
  • Rate limits and throttling: the limits can differ, and retry-after guidance may require tweaks to your backoff strategy.

A practical firsthand example

Run a dual-path approach: v0 remains default, while a new client calls v2024-03-20 behind a feature flag. For one marketplace, route 5% of new inbound shipments to the new version. Compare outputs (labels, ASN data, carton details) before you accept. If anything mismatches, flip the flag off in seconds.

Add safeguards:

  • Pin canary traffic by SKU group or FC to isolate impact.
  • Record both versions’ response hashes so you can diff quickly—if the diff is only field ordering or harmless whitespace, mark it non-material.
  • Place alert thresholds on rejection codes. If a specific FC starts rejecting shipments in the canary path, auto-disable the flag for that FC.

Prereqs before you touch code

  • Inventory every endpoint you use and its call frequency.
  • Identify downstream consumers (WMS, ERP, BI) that rely on response shapes.
  • Define success metrics: parity rate, error budgets, and time-to-rollback.
  • Confirm authentication scopes and roles for v2024-03-20; test token exchange in a non-prod environment.
  • Capture baseline metrics on v0 now: median/95th response times, error rates, average retries per call, and typical throttling patterns.
  • Map idempotency behavior: ensure create/update operations are safe to retry without duplicating shipments.
  • Prepare a sandbox or staging environment that mirrors production configs as closely as possible.

Why Migration Discipline

Risks of fast cutover

A blind cutover is how you get stuck labels, rejected shipments, and support tickets. Your inbound pipeline touches procurement, inventory accounting, and customer promises. Small API mismatches ripple into big costs—fast.

Multiply the pain: one bad field mapping can cascade. Procurement expects arrival dates, finance expects landed cost updates, and CX expects accurate delivery windows. If inbound stutters, you’re juggling backorders, refunds, and overtime. It’s not just an integration—it’s your margin.

No freeze migration mindset

You want a plan that upgrades without pausing operations. The move is live-fire: the shop stays open. That means parallel paths, guardrails, and evidence before promotion. Think like an SRE, not just a developer.

Treat this like an availability problem: define an error budget, decide what counts as a “critical mismatch” (e.g., wrong FC routing, incorrect carton count), and set your rollback policy ahead of time. If the budget burns, you roll back—no debates.

A crisp example

  • Keep v0 as the primary.
  • Shadow-run v2024-03-20 on the same requests but don’t commit its results.
  • Compare artifacts: shipping plans, SKU-level prep details, cartonization data.
  • Only when your parity threshold (e.g., 99% fields match) holds for a week do you promote.

During shadowing, test ugly paths on purpose: malformed SKUs, hazmat/oversize, peak-hour bursts, and network hiccups. If your diff tool flags a mismatch, categorize it: harmless formatting, minor data shift, or critical. Only critical mismatches block promotion; minor ones become backlog items.

What good looks like

  • Versioned clients, isolated configs per marketplace.
  • Feature flags to shift traffic by SKU group, FC destination, or marketplace.
  • Logging that ties each request ID across versions so you can diff results.
  • Idempotent writes and safe retries with jittered backoff.
  • Clear ownership: who triages errors, who approves promotion, who hits rollback.
  • Synthetic checks that run every few minutes against both versions to catch regressions before your canary traffic does.

AWS Playbooks

App migration mindset

Borrow the aws migration hub mentality: discover dependencies, map owners, set waves, track status. Document every surface area this API touches—rate limits, throttling behavior, and error codes. When you can see the whole system, you can control risk.

Build a simple RACI:

  • Product/ops: define acceptance criteria and shipment SLAs.
  • Engineering: build the client, translators, and tests.
  • SRE/infra: observability, rollback automation, and incident response.
  • QA/analysts: parity diffing, artifact validation, and signoff.

AWS migration tools

Use a spreadsheet or a board like it’s a migration backlog: endpoints as tasks, tests as acceptance criteria. Think how AWS application migration service (mgn) handles lift-and-shift—continuous replication, cutover windows, no downtime mentality—and mimic it at the API layer with request mirroring and side-by-side clients.

Backlog columns that work:

  • Discover (inventory endpoints, scopes, rate limits)
  • Build (client + translation layer)
  • Test (contract + negative tests)
  • Shadow (mirroring on prod traffic)
  • Canary (5–25% live traffic)
  • Promote (prod 100%)
  • Retire (disable v0, delete dead code)

Partners are force multipliers

If you work with an implementation partner, look for the aws migration and modernization competency. It signals they have proven playbooks for staged rollouts, governance, and operational readiness. You want that rigor here.

Use them to accelerate the boring, critical parts: runbook drafting, feature flag plumbing, SLO dashboards, and post-mortem facilitation. Your team focuses on domain logic while they shoulder the migration scaffolding.

This week playbook

  • Wave 0: Read-only calls, contract tests, and mock responses.
  • Wave 1: Low-risk SKUs and marketplaces, canary at 5%.
  • Wave 2: Expand to 25–50%, add more edge cases (bundles, hazmat, oversize).
  • Wave 3: 100%, but keep v0 warm for rollback.

Add promotion gates to each wave:

  • No critical mismatches for X business days.
  • Error rate within baseline + agreed delta.
  • All known throttling hotspots handled by backoff without paging.
  • Stakeholder signoff (ops + engineering + SRE).

Expected outcome

Fewer surprises, faster recovery, better stakeholder alignment. It’s the same reason cloud migrations work when scoped in waves.

Verification gauntlet

Contract tests first

Write automated contract tests for every endpoint you use. Validate required fields, acceptable enums, and error shapes. Stub network calls during CI, then run live smoke tests in staging against v2024-03-20.

Don’t forget negative tests: invalid SKUs, missing prep data, oversized cartons, and throttling responses. Prove your client handles 429/503 with retries, respects retry-after headers, and surfaces human-friendly messages when an operator needs to step in.

Data parity gate

For a representative sample of inbound shipments, compare v0 vs. v2024-03-20 outputs: prep instructions, label data, carton counts, and routing. Store diffs. Promotion criteria should be explicit: X days of canary traffic with ≤Y non-material diffs and 0 critical mismatches.

For faster parity diffing and queryable logs during cutover, consider Requery: https://remktr.com/requery.

Automate the diff:

  • Normalize keys and sort arrays so you aren’t diffing noise.
  • Whitelist known acceptable differences (e.g., error message wording) so alerts aren’t spammy.
  • Persist diffs to a dashboard so approvers can scan trends over time.

Observability and tooling

If you’re monitoring on Azure, be aware of microsoft monitoring agent end of life. Microsoft retired the Log Analytics agent on August 31, 2024; migrate to Azure Monitor Agent (AMA). The azure monitor agent windows service name is “AzureMonitorAgent.” Update your dashboards and alerts so you don’t lose visibility mid-migration.

Complement logs with metrics and traces:

  • Metrics: success rate, latency percentiles, retry counts, and throttling events per endpoint.
  • Traces: correlate upstream WMS calls to SP-API requests with a shared correlation ID.
  • Alerts: threshold-based for hard failures, anomaly-based for sudden spikes in retries or rejections.

A firsthand workflow that works

  • Create correlation IDs and log them across both versions.
  • Emit structured logs (JSON) with request/response hashes for diffing.
  • Track SLOs: response time, error rate, and shipment acceptance rate by FC.
  • Build a one-click rollback that flips traffic back to v0 instantly.
  • Keep a dry-run mode for new marketplaces so your team can probe real edge cases without committing results.
  • Schedule “game days” during canary to practice rollback under time pressure.

After the cut

Stabilize before you optimize

Resist the urge to immediately refactor. Run v2024-03-20 as-is for a full cycle (weekly, biweekly—your cadence). Watch rejection codes, rework rates, and label reprints. If your incident trend is flat, you earned the right to tune.

Stabilization checklist:

  • Freeze non-essential feature changes for one sprint.
  • Keep extra logging on until you’re confident; then right-size to control costs.
  • Review alert noise and tighten thresholds once you understand normal.

Modernize your edge

If the new API offers cleaner request shapes, move transformations upstream—normalize SKUs at the edge, enforce validation in your domain layer, and trim custom glue. Your future self will thank you when the next version drops.

Pay down integration debt:

  • Replace brittle regex mappers with typed validators.
  • Centralize enum mappings so future changes are one line, not fourteen.
  • Build idempotency keys into write operations to make retries safe forever.

Documentation is a feature

Update runbooks, API maps, and dashboards. Archive v0 docs with a clear deprecation date and a big “do not use” banner in your internal portal. If you do enable v0 calls for a short safety window, time-box them with alarms.

Make docs task-focused:

  • “How to triage a rejection code” with screenshots and expected timelines.
  • “How to trigger rollback” with required approvals and the exact command.
  • “Where to find parity diffs” with links to dashboards and log queries.

A realistic sunset plan

  • T+7 days: V0 disabled in prod paths; allowed only in a break-glass mode.
  • T+30 days: Revoke v0 credentials; delete dead code; archive logs.
  • T+60 days: Close out the migration epic; publish lessons learned.

Quick win checklist

  • Confirm no new v0 traffic for 14 days.
  • Remove feature flags and stale toggles.
  • Bake parity tests into regression so future changes stay safe.

90 Second Pulse Check

  • You’re upgrading from v0 to v2024-03-20 with Amazon’s migration guidance and use-case maps.
  • Run both versions in parallel, canary traffic, and promote only on proven parity.
  • Borrow AWS discipline: plan waves, track work, and use automation.
  • Verify with contract tests, structured logging, and clear SLOs.
  • Update monitoring as tools change (move from MMA to AMA on Azure).
  • Retire v0 deliberately—time-box, document, and enforce.

FAQ

1)

Freeze deployments?

No. Treat this as a live migration. Keep v0 as the default, shadow or canary v2024-03-20, and promote when parity holds. Feature flags and staged waves let you deploy continuously without operational pauses.

2)

Minimize schema risk

Build a translation layer. Version your client and normalize data into your domain model. That way, downstream systems (WMS/ERP/BI) see consistent objects while you swap the upstream integration.

3)

Monitoring changes now

If you use Azure for telemetry, migrate from the deprecated Log Analytics agent (MMA) to Azure Monitor Agent. The Windows service name for AMA is AzureMonitorAgent. Update dashboards and alerts before the cutover so you don’t lose visibility.

4)

AWS in SP API

Use AWS thinking, even if you’re not moving servers. The aws migration hub approach—discovery, wave planning, status tracking—maps perfectly. Borrow the mindset from aws application migration service (mgn): parallel paths, safe cutovers, and instant rollback.

5)

Partner competency?

Not required, but helpful if your estate is complex. Competency partners bring proven runbooks for staged rollouts, governance, and post-migration hardening. If you’re short on internal bandwidth, they can accelerate and de-risk.

6)

Keep v0 how long?

Time-box it. Common practice is 7–30 days for emergency rollback only. If you see no critical issues, revoke credentials and delete dead code. Keeping v0 around invites accidental usage and drift.

7)

Avoid throttling storms

Respect the documented rate limits for each endpoint and implement exponential backoff with jitter. Use the retry-after guidance when provided, and cap retries to avoid thundering herds. Track per-endpoint token buckets in your telemetry so you can see when you’re skirting the edge.

8)

Use SP API sandbox?

Yes. Run smoke and contract tests in a sandbox or staging environment first to validate scopes, payload shapes, and basic flows. It won’t catch every production edge case, but it reduces the surface area of surprises.

9)

Prove idempotency

Attach an idempotency key (deterministic per business operation) and store the mapping between key and result. On retry, return the original response if the operation already succeeded. Test this under network blips and forced timeouts to ensure no duplicate shipments are created.

10)

Partial parity plan

Promote selectively. Keep traffic segmented by marketplace or FC. If EU passes parity and NA doesn’t, go live in EU first and keep NA in canary while you address the gaps.

Zero Drama Cutover

1) Inventory: List every endpoint you use, consumers downstream, and SLOs. 2) Dual-path: Build a v2024-03-20 client; keep v0 live behind flags. 3) Test: Automate contract tests and parity checks; shadow-run before canary. 4) Canary: Send 5–25% traffic; monitor errors, rejections, and labels. 5) Promote: Move to 100% when parity holds; keep rollback hot for a week. 6) Retire: Disable v0, delete code, archive docs, and publish lessons learned.

Quick pro tips while you run it:

  • Keep your change window sensible—don’t promote at 4 p.m. on a Friday.
  • Inform stakeholders with a simple status board: current wave, error rate, next gate.
  • Tag every log line with version=v0 or v2024-03-20 so you can filter fast.

Shipments don’t wait for your refactor. The teams that win migrations treat them like operations, not just code. You map dependencies, stage the rollout, observe everything, and only then promote. Do that, and this upgrade becomes a non-event for your customers—and a future-proofing move for you.

Want to see how similar teams shipped zero-downtime migrations? Browse our Case Studies: https://remktr.com/case-studies.

References

  • Amazon Selling Partner API: Fulfillment Inbound API docs: https://developer-docs.amazon.com/sp-api/docs/fulfillment-inbound-api
  • AWS Application Migration Service (MGN): https://aws.amazon.com/application-migration-service/
  • AWS Migration Hub: https://aws.amazon.com/migration-hub/
  • AWS Migration and Modernization Competency: https://aws.amazon.com/partners/competencies/migration-and-modernization/
  • Azure Monitor Agent overview (Log Analytics agent retirement): https://learn.microsoft.com/azure/azure-monitor/agents/azure-monitor-agent-overview
  • Migrate from Log Analytics agent to Azure Monitor Agent: https://learn.microsoft.com/azure/azure-monitor/agents/azure-monitor-agent-migration
  • Selling Partner API: Throttling and rate limits: https://developer-docs.amazon.com/sp-api/docs/throttling-and-rate-limits
  • Connecting to the Selling Partner API (LWA and roles): https://developer-docs.amazon.com/sp-api/docs/connecting-to-the-selling-partner-api
  • AWS deployment strategies (canary, blue/green): https://docs.aws.amazon.com/whitepapers/latest/overview-deployment-options/deployment-strategies.html